Power Advisory: Feb. 8, 2009 3:18 pm
NGCP will conduct emergency interup 2nga fedr to efect lod xfer. maasin sub station s experiencing oil leakage.
|
|
Power Advisory: Feb. 7, 2009 12:00 pm
3 line trippers are currently being attended to by ngcp; 1 in maasin 2 in Tunga particularly along Lemon-Biliran and Tong-Kananga.
no estimated restoration time yet given by NGCP.
Power Advisory: Feb. 8, 2009 3:18 pm
NGCP will conduct emergency interup 2nga fedr to efect lod xfer. maasin sub station s experiencing oil leakage.
2/18/2008
a 3-HR power outage will be experienced from 1 to 4 pm today to affect hot spot correction of our biliran sub-station air break switch.
10/03/2010 Tomorrow, Sunday. 12-hr power interruption will be experienced in the whole coverage area due to preventive maintenance of 69kv lemon-biliran line by ngcp
Nov. 23, 2010. Power interruption will be experienced on Nov. 28 2010 from 6am to 6pm on all BILECO coverage area due to NGCP replacement of rotten wood poles at the 69 kv Lemon-Biliran line.
Another long outage happening now. Its discouraging to see that these power outages have been going on for so long and still happening. People seem to have got so used to them that no one even updates that there is a power outage or how long it will last. I guess fiber-optic Internet lines are out of the question? Joke only.
2/3/2012 1 pm: Ngcp now conducting line correction @ brgy lemon to tighten d 69 conductor wires affected by strong wind blowing n d area. Estimated restoration time s 2 hrs. -BILECO
| « Previous Thread | Next Thread » |
| Thread Information |
Users Browsing this ThreadThere are currently 1 users browsing this thread. (0 members and 1 guests) |
| Tags for this Thread |