NAVAL, Biliran (BDEO) – For transparency of project implementation, officials of the Department of Public Works and Highways (DPWH)- Biliran District Engineering Office (DEO) headed by OIC-District Engineer Alfredo L. Bollido conducted various project inspections together with the local media of this Province.
According to OIC-DE Bollido, during his interview with Mr. Rodrigo S. Victoria, PIA-Biliran Information Center Manager, the said project inspection was conducted to ensure proper construction methods in accordance with the DPWH Standards.
“Although our project engineers, materials engineers and quality engineers regularly conduct project inspections, we would also want to personally see the actual status of the projects and inspect if construction methods are being followed by the contractors especially when projects are still on-going,” said OIC-DE Bollido.
Projects inspected are the on-going and completed projects along the Naval – Almeria – Kawayan, Culaba- Naval-Caibiran Cross Country Road (NCCCR) road section which include road slope protections, reconstruction of bridge and road concreting projects in convergence with the Department of Trade and Industry in coordination with the Representative Gerardo J. Espina Jr. of the Lone District of Biliran.