Biliran Bridge

The Department of Public Works and Highways (DPWH)-Biliran District Engineering Office announced that the Biliran Bridge has now been restored to its original 15-ton (15,000-kilogram) maximum allowable load capacity and is open to all types of vehicles.

District Engineer Irwin L. Antonio said the lifting of the previous vehicle-type restrictions came after the completion of the replacement of the bridge’s expansion joints, allowing the structure to return to its prescribed load capacity prior to the bridge-swaying incident on December 23, 2024.

The Biliran Bridge serves as a vital transportation link and the only road connection between the Province of Biliran and the neighboring province of Leyte, facilitating the movement of people, goods, and essential services.

With the completion of the necessary repair works, Antonio clarified that all types of vehicles are now permitted to cross the Biliran Bridge, provided that the vehicle’s total load does not exceed the 15-ton maximum allowable capacity.

However, to ensure the continued safety of motorists and preserve the structural integrity of the bridge, motorists are required to strictly observe the following regulations while crossing the bridge: no shifting of gears, only one vehicle at a time shall be allowed to cross, and vehicles must maintain a speed of 15 to 20 kilometers per hour (KPH).

Antonio emphasized that strict compliance with these regulations is necessary. With the current development, DPWH-Biliran DEO urged the cooperation of all Biliranons and motorists, which will ultimately redound to the greater benefit of the province.

Previous articleDOST Command Vehicle, Dako og Ikatabang sa Disaster Response sa Biliran
Next articleDPWH-BILIRAN DEO INTRODUCES DPWH DOCUMENT TRACKER SYSTEM

LEAVE A REPLY

Please enter your comment!
Please enter your name here