{"id":24244,"date":"2026-09-21T14:35:17","date_gmt":"2026-09-21T06:35:17","guid":{"rendered":"https:\/\/www.biliranisland.com\/blogs\/?p=24244"},"modified":"2026-09-21T14:35:18","modified_gmt":"2026-09-21T06:35:18","slug":"dpwh-biliran-constructs-p24-47-m-food-processing-facility-in-naval","status":"publish","type":"post","link":"https:\/\/www.biliranisland.com\/blogs\/2026\/09\/21\/dpwh-biliran-constructs-p24-47-m-food-processing-facility-in-naval\/","title":{"rendered":"DPWH-BILIRAN CONSTRUCTS P24.47-M FOOD PROCESSING FACILITY IN NAVAL"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><a><strong>NAVAL<\/strong><\/a>, Biliran (BiliranDEO)&nbsp;\u2013&nbsp;The Department of Public Works and Highways (DPWH) \u2013 Biliran District Engineering Office is implementing the construction of a P24.47-million Multi-Purpose Building (Food Processing Facility) in Barangay Larrazabal, Naval, Biliran, aimed at providing a dedicated space for the processing and preservation of local agricultural products.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of August 31, 2026, the project has reached 7.30% physical accomplishment, with construction activities underway.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1820\" height=\"1024\" src=\"http:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-1820x1024.jpg\" alt=\"Food Processing Facility\" class=\"wp-image-24245\" srcset=\"https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-1820x1024.jpg 1820w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-800x450.jpg 800w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-768x432.jpg 768w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-1536x864.jpg 1536w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-2048x1152.jpg 2048w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-747x420.jpg 747w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-696x392.jpg 696w, https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing2-1068x601.jpg 1068w\" sizes=\"auto, (max-width: 1820px) 100vw, 1820px\" \/><figcaption class=\"wp-element-caption\">Food Processing Facility<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Once completed, the facility is expected to provide a safe and suitable environment for food processing, helping improve the quality and preservation of locally produced agricultural products.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beyond providing the needed infrastructure, the project is also seen to support livelihood opportunities in the community by creating a facility where local agricultural products can be processed and given added value.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;DPWH-Biliran DEO continues to implement infrastructure projects that respond not only to physical development needs but also contribute to the economic and livelihood potential of local communities in Biliran Province.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NAVAL, Biliran (BiliranDEO)&nbsp;\u2013&nbsp;The Department of Public Works and Highways (DPWH) \u2013 Biliran District Engineering Office is implementing the construction of a P24.47-million Multi-Purpose Building (Food Processing Facility) in Barangay Larrazabal, Naval, Biliran, aimed at providing a dedicated space for the processing and preservation of local agricultural products. As of August 31, 2026, the project has [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24246,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"tdm_status":"","tdm_grid_status":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-24244","post","type-post","status-publish","format-standard","has-post-thumbnail","category-currentevents"],"jetpack_featured_media_url":"https:\/\/www.biliranisland.com\/blogs\/wp-content\/uploads\/2026\/09\/Food-Processing-scaled.jpg","_links":{"self":[{"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/posts\/24244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/comments?post=24244"}],"version-history":[{"count":1,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/posts\/24244\/revisions"}],"predecessor-version":[{"id":24247,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/posts\/24244\/revisions\/24247"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/media\/24246"}],"wp:attachment":[{"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/media?parent=24244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/categories?post=24244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.biliranisland.com\/blogs\/wp-json\/wp\/v2\/tags?post=24244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}