04-05-2016
BILECO SCHEDULE OF POWER INTERRUPTION ACTIVITIES for AREA 2
(April 6-April 8, 2016)
1. A maximum EIGHT-HOUR (8-HR) power interruption will be experienced in Area-2 starting from SITIO ANDRADE, ASUG, CAIBIRAN going to CULABA up to VILLA CORNEJO, KAWAYAN on APRIL 6, 2016, WEDNESDAY, from 8:00 AM to 4:00 PM due to the replacement of rotten wood poles in CAIBIRAN to BARIIS in preparation for 2016 National Election.
2. A maximum SIX-HOUR (6-HR) power interruption will be experienced in BRGY. ACABAN, CULABA on APRIL 7, 2016, THURSDAY, from 10:00 AM-4:00 PM due to pole hole digging and pole dragging near Efren Macabacyao residence.
2. A maximum SIX-HOUR (6-HR) power interruption will be experienced in BRGY. ACABAN, CULABA on APRIL 8, 2016, FRIDAY, from 10:00 AM-4:00 PM due to replacement of two secondary structure near Efren Macabacyao residence.