11-29-2008
power alert! a 12 hr power outage afecting the entire BILECO area coverage will be experienced tommorrow (12-30-2008) from 6am to 6pm for various line maintenance activities.
|
Nov. 19, 2008 7 pm
The energization attempt failed. Sambulan - Biliran line section is now being isolated by TRANSCO. Line inspection to be conducted tomorrow A.M. due to bad weather condition.
No. 20, 2008 8 pm
A detached insulator was noted by TRANSCO personnel during an inspection this A.M. Repair works are ongoing. Estimated power restoration time is 10 am
BILECO E-TEXT MO FACILITY
TEXT
POWER UPDATE BILECO
TO 2278 (GLOBE/TM); 216 (SMART/TNT)
Why does BILECO Customers experience prolong power interruptions whenever there is a sustained line fault along the 69 kv line?
BILECO TELEPHONE NUMBERS 500.9039 ; 500.9040 ; 500.9041; 500.9042; 500.9744 (HOTLINE)
Last edited by Wowie; 11-20-2008 at 05:16 PM. Reason: Typo's?
11-29-2008
power alert! a 12 hr power outage afecting the entire BILECO area coverage will be experienced tommorrow (12-30-2008) from 6am to 6pm for various line maintenance activities.
BILECO's INEFFICIENCIES ARE VERY MUCH NOTICEABLE NOWADAYS.
IN ONE BGRY. ANG MGA BAG-ONG WATTMETERS NAGKABAYLO-BAYLO ANG TAPPING. MEANING, ANG METRO NKAPANGAN SA USA KA RESIDENTE PERO ANG LINYA NA KABIT SA LAING BALAY. OMG! IF IT'S NOT INCOMPITENCE, I DON'T KNOW WHAT ITS!
UPDATE:
Power advisory for January 14, 2008 7pm
Sustained linefault along 69kv tunga feedr. on going patrol
Last edited by jalmz; 01-16-2009 at 01:48 PM.
POWER UPDATE Jan. 15, 2009 8:30am:
tongonan - lemon - biliran 69 kv line remain isolated due to constant line trippings xperienced last nyt. transco personnel are now focusing nspection along said line. Dorelco and Leyeco 3 wer energized last nyt via maasin fedr.
Last edited by jalmz; 01-16-2009 at 01:48 PM.
Power update: Jan. 15, 2008 9:00 pm
the entire 69 kv tunga feedr s down again, no further advice from transco
emergency repair at d TRANSCO ormoc sub-station recivng tower now ongoing. estimated restoration time 1 hr.
Hey!
Where's the reply i posted here just a few hours ago? Can't accept that someone corrected you guys? C'mon. Am i not entitled for some credits here?
POWER ADVISORY: Jan. 27, 2009
a 15 hr power outage will be experienced in the entire BILECO are coverage starting 4 am of Jan. 28 for various activities in relation to the energization of the 3.15 MVA sub-station transformer to serve feeder 2 (cabucgayan, caibiran and culaba districts). NGCP also scheduled PMS along Biliran-Lemon 69 kv line
I have never seen a electric company have such a hard time keeping the meters running.
Last edited by shanebo; 01-28-2009 at 10:10 PM. Reason: Because
Power Advisory: Feb. 6, 2009 5:50 pm
We an emergency at the sub station. power service will be restored shortly..
6:30 pm
ngcp will conduct normalization along 2nga fedr anytime from now. power service will be restored shortly.
Last edited by jalmz; 02-06-2009 at 06:24 PM. Reason: added 6:30 pm advisory