Notices
 

Thread: BILECO: Power Interruptions

Page 2 of 9 FirstFirst 1234 ... LastLast
Results 11 to 20 of 84
  1. Default  
    #11
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    Power Advisory: Feb. 7, 2009 12:00 pm

    3 line trippers are currently being attended to by ngcp; 1 in maasin 2 in Tunga particularly along Lemon-Biliran and Tong-Kananga.

    no estimated restoration time yet given by NGCP.
    "the heart has its reasons which reasons cannot understand"....
     

  2. Default  
    #12
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    Power Advisory: Feb. 8, 2009 3:18 pm

    NGCP will conduct emergency interup 2nga fedr to efect lod xfer. maasin sub station s experiencing oil leakage.
    "the heart has its reasons which reasons cannot understand"....
     

  3. Default  
    #13
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    2/18/2008

    a 3-HR power outage will be experienced from 1 to 4 pm today to affect hot spot correction of our biliran sub-station air break switch.
    "the heart has its reasons which reasons cannot understand"....
     

  4. Default  
    #14
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    10/03/2010 Tomorrow, Sunday. 12-hr power interruption will be experienced in the whole coverage area due to preventive maintenance of 69kv lemon-biliran line by ngcp
    "the heart has its reasons which reasons cannot understand"....
     

  5. Default  
    #15
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    Nov. 23, 2010. Power interruption will be experienced on Nov. 28 2010 from 6am to 6pm on all BILECO coverage area due to NGCP replacement of rotten wood poles at the 69 kv Lemon-Biliran line.
    "the heart has its reasons which reasons cannot understand"....
     

  6. Default  
    #16
    Join Date
    Apr 2008
    Location
    I live somewhere near Naval
    Posts
    901
    Rep Power
    13
    Another long outage happening now. Its discouraging to see that these power outages have been going on for so long and still happening. People seem to have got so used to them that no one even updates that there is a power outage or how long it will last. I guess fiber-optic Internet lines are out of the question? Joke only.
     

  7. Default  
    #17
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    2/3/2012 1 pm: Ngcp now conducting line correction @ brgy lemon to tighten d 69 conductor wires affected by strong wind blowing n d area. Estimated restoration time s 2 hrs. -BILECO
    "the heart has its reasons which reasons cannot understand"....
     

  8. Default  
    #18
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    08/02/2013 - A 2 & 1/2-hr pwr outage will b xperienced in Balite to Villa Cornejo, Kawayan frm 9:30am-12nn due to pull out of rotten wood pole (C1 structure) in Masagaosao, Kawayan. - BILECO
     

  9. Default  
    #19
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    Power Update: 04 Aug 2013 @ 8:31 AM; 69kV Milagro-Tunga TL tripped. Energized @ 8:33 AM. but tripped again. after 3 attempts to energize the line still it failed. declared sustained line fault. on going line inspection. suspect tripper somewhere in Kananga, Leyte. affected customers: BILECO, LEYECO III, LEYECO V and DORELCO. Will keep u posted.

    08/04/2013 - A pwr outage was xperienced n the entire area coverage due to sustained line fault along 69kV Milagro-Tunga feeder. Pwr was restored at 12:31pm after the load transfer to the Maasin Substation. - BILECO
    Last edited by jalmz; 08-04-2013 at 02:02 PM.
     

  10. Default  
    #20
    Join Date
    Apr 2007
    Location
    Biliran Island
    Posts
    980
    Rep Power
    10
    Electric power from Bileco resumed at 12:31 pm following an unexpected brownout. We are now connected to the Maasin feeder. Later, we will experience power outage to return to the Tunga feeder.
     

Thread Information
Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Higher generation rate seen next year - BILECO
    By jalmz in forum Current Events
    Replies: 0
    Last Post: 11-22-2010, 09:43 AM
  2. Comments and Suggestions about BILECO
    By jalmz in forum General Discussions
    Replies: 0
    Last Post: 07-17-2008, 04:39 PM
  3. The power syndrome
    By Jeff in forum Current Events
    Replies: 0
    Last Post: 05-09-2008, 02:16 PM
  4. The power of prayer
    By Jeff in forum Of Faith and Beliefs
    Replies: 2
    Last Post: 09-15-2007, 11:12 AM
Tags for this Thread

View Tag Cloud

Bookmarks
Bookmarks
Posting Permissions
  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •