Biliran Island Picture Gallery
prev
Anas Flood Control
next

View Larger Image


Anas Flood Control



Construction of Anas Flood Control along Biliran Circumferential Road
Contractor: CTC and Construction Supplies
Date Started: February 06, 2014
Duration: 60 Days
Contract Completion Date: April 06, 2014
Contract Cost: P 4,326,993.0
Construction Consultant:
Implementing Office: DPWH-Biliran District Engineering Office, Naval, Biliran
Source of Fund: SARO No. GAA CY 2014 dtd. 01/02/2014


Photo by Jalmz



<<
image46.jpg image45.jpg Anasfloodcontrol-1.jpg NavalTricycleStation-1.jpg image44.jpg
>>
Photo Details

Photo Sharing Gallery by PhotoPost
Copyright © 2014 All Enthusiast, Inc.

BiliranIsland.com is created by Anthony Marlon Mecaral
Corvera St. Naval, Biliran, Philippines.
e-mail to: admin(at)biliranisland.com
Webhosting Sponsored by Panamao Travel and Tours, Biliran Island Picture Gallery is sponsored by Andrea Mecaral Simon
Credit: Jefferson Baraquil, San Jose Calif. (for the banner)
© 2005 - 2022 BiliranIsland.com. All rights reserved.

Disclaimer | Privacy Policy | Terms of Service
No portion of this page, text, images or code, may be copied, reproduced, published or distributed in any medium without the expressed written permission of the copyright holder.